1



FQE Barium-Clear treatment increases production and production times for an operator in Oklahoma

We started batch treatments of FQE Barium-Clear in a pumping oil well that would only run for about 1 week. Since treatment started, the well has been producing for 4+ months with no downtime and has seen an increase in production.

2


FQE Barium-Clear treatment increases production and production times for an operator in Kansas.

The well was treated with 100 gallons of FQE Barium-Clear and shut-in overnight. Production was returned the next day, and continuous batch treatments were started. Before our treatment, the operator would scale up pump and lose production in 1-2 weeks, the well has been pumping for over 9 weeks now, and production has increased.

3


An operator in Oklahoma decreased their LOE cost by 95% from the previous year by utilizing an FQE Barium-Clear treatment.

A producing oil well encountered downhole problems to the pump and rods due to iron sulfate and iron sulfide scaling issues. In 2019 the well had to be pulled 6 times.

In November of 2019, a 50 bbl batch treatment was performed down the backside. The well was shut in over the weekend, and weekly batch treatment of 33 gallons was initiated. The well’s production has stayed steady with a minor increase in production but has not had any downtime since treatments began. Overall, LOE costs have decreased 95% from the year prior by eliminating the need for a workover rig to replace rod parts/pump from the scale issue.

For a Case Study PDF and more information please submit the form below.

Get In Touch

Address

Office: 13120 N. MacArthur Blvd, Oklahoma City, OK 73142

Phone Number:

405-554-9585

Copyright 2024. All rights reserved